Intelligence
Claims Intelligence
What drives severity, cycle time and leakage across the claim book — with the evidence behind every signal.
Avg Cycle Time
18.4 days
-4.2 days YoY
Severity Accuracy
87%
Predicted vs settled
Claims Near SLA
12
Escalation recommended
Estimated Leakage Avoided
$2.4M
Trailing 12 months
Cycle Time & Documentation
Trailing six months
Active Claim Assessment
INC-2026-000385
- Estimated Severity$85K–$120K
- Mitigation PriorityHigh
- Water Duration RiskElevated
- Documentation QualityStrong
- Potential Coverage IssueNone detected
AI-generated recommendation — Human review required
Cycle Time Drivers
Correlation strength in the simulated dataset
- Pre-loss documentation present-4.6 days cycle time
- Day-1 mitigation evidence-3.1 days cycle time
- Contractor documentation score-2.4 days cycle time
- Estimate rework+3.8 days cycle time
- Owner response latency+1.9 days cycle time
Pipeline Distribution
Open claims by stage
- FNOL Received45
- Triage38
- Mitigation23
- Estimate Review15
- Repair10
- Closed7