DEMO ENVIRONMENT — SIMULATED DATA

Intelligence

Claims Intelligence

What drives severity, cycle time and leakage across the claim book — with the evidence behind every signal.

Avg Cycle Time

18.4 days

-4.2 days YoY

Severity Accuracy

87%

Predicted vs settled

Claims Near SLA

12

Escalation recommended

Estimated Leakage Avoided

$2.4M

Trailing 12 months

Cycle Time & Documentation

Trailing six months

Active Claim Assessment

INC-2026-000385

  • Estimated Severity$85K–$120K
  • Mitigation PriorityHigh
  • Water Duration RiskElevated
  • Documentation QualityStrong
  • Potential Coverage IssueNone detected

AI-generated recommendation — Human review required

Cycle Time Drivers

Correlation strength in the simulated dataset

  • Pre-loss documentation present-4.6 days cycle time
  • Day-1 mitigation evidence-3.1 days cycle time
  • Contractor documentation score-2.4 days cycle time
  • Estimate rework+3.8 days cycle time
  • Owner response latency+1.9 days cycle time

Pipeline Distribution

Open claims by stage

  • FNOL Received45
  • Triage38
  • Mitigation23
  • Estimate Review15
  • Repair10
  • Closed7