Intelligence
Risk Intelligence
Peril exposure, pre-event readiness and predicted loss frequency across 12,480 protected properties.
Properties Exposed
347
Active advisory
High-Risk Properties
1,124
Composite score ≥ 70
Pre-Event Ready
78%
Documentation current
Predicted Loss Frequency
2.4%
Next 90 days
Exposure by Peril
Properties within modeled footprint
Property Risk Signals
Acme Office Building
- Flood RiskElevated
- Wind RiskModerate
- Fire RiskLow
- Water Loss RiskHigh
- Freeze RiskLow
- Severe Weather RiskElevated
Water loss risk elevated by a degraded detection sensor and unresolved supply-line inspection.
Open Risk Reduction Actions
Preventive tasks by risk level
- High
Inspect second-floor supply lines
Acme Office Building · Property Manager · due Overdue 4 days
- High
Replace water detection sensor — mechanical room
Acme Office Building · Property Manager · due May 20, 2026
- Elevated
Pre-event documentation before storm season
12 exposed properties · Property Owner · due May 24, 2026
- Moderate
Seal north elevation envelope joints
Acme Office Building · General Contractor · due Jun 15, 2026
- Moderate
Verify emergency contractor availability
Austin region · Disaster Shield · due May 30, 2026
Risk Signals Feed
Generated from ecosystem activity
347 properties exposed to severe storm risk.
8:12 AM
12 properties recommended for pre-event documentation.
8:20 AM
Contractor response capacity decreased 18% in Tampa.
8:31 AM
Claim DS-34872 documentation is 72% complete.
8:38 AM
Potential mitigation delay detected.
8:44 AM